ES 242
Project Topic: Getting Items up & down stairs in a home related to laundry, packages, equipment etc. when you must hold a railing and cannot carry anything.
Group Members: Tim Plakunov, Ryan McCall, Taha & Aditya Lingaraju
|
Step |
Description |
3-Feb |
10-Feb |
17-Feb |
24-Feb |
2-Mar |
9-Mar |
16-Mar |
23-Mar |
30-Mar |
6-Apr |
13-Apr |
20-Apr |
27-Apr |
4-May |
|
1 |
Identifying the Design |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Knowing the Constraints |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Identifying the user needs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Prepare Objective Tree |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Develop an Effective Problem Analysis |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Planning |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
System Design |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Parameter Level Design |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Detailed/Tolerance Level Design |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10 |
Planning for Testing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11 |
Review/Assessment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
12 |
Improvement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|